ADS FlowShark IS Manual

Note:

Do not drill new holes through the housing for

mounting! This will expose the internal components of the

enclosure to moisture, creating unsafe operating

conditions. It also will void the product warranty. Use only

the mounting holes provided under the corner cover screws

to mount the supply.

2. Verify that the 6-foot AC power cord on the power supply is

suitable for the application. Customer-supplied cabling also

may be used. A cable grip fitting, sized for a 0.125- to 0.375-

inch OD cable, seals the exit for the DC output cabling.

Replace the cable grip fittings to accommodate custom AC

supply or DC output wiring, when necessary.

WARNING:

When hard-wiring to the AC supply, ensure

that the AC source is de-energized and that all applicable

lockout/tagout and other electrical safety measures are

followed.

3. Remove the front cover from the power supply by loosening

the 4 plastic screws.

4. Run the 10-foot external power cable (ADS p/n 5000-0697),

coming from the EMU, through the cable grip entry hole on the

side of the power supply case opposite the AC power cord. If

additional length is required, select an appropriate gauge of

cable for the end run to the power source. If cable splicing is

necessary, use a junction box or other method suitable for

outdoor, wet, and/or buried environments.

5. Terminate the wires from the external DC power cable at the

power supply in the following way:

Connect the –DC In wires from the cable to the –V

terminal in the power supply.

Connect the +DC In wires from the cable to the +V

terminal in the power supply.