ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 233

Advertising
background image

Index In-5

collecting data, 6-34
configuration, 6-2
connecting sensors, 3-45
connectors, 2-10
description, 2-4
digital signal processor board, 2-5
GPRS communication, 2-5
installation, 7-1

manhole rim, 7-5
manhole wall, 7-2

location, 6-2
maintenance confirmation, 8-3
maintenance inspection, 8-3
memory, 2-1
power, 1-3
replacing battery pack, 8-5
specifications, A-1
temperature, 6-20
troubleshooting, 8-18
typical installation, 3-2
upgrading firmware, 6-42
viewing diagnostic logs, 6-45
voltage regulator board, 2-9
voltage to frequency board, 2-8
warranty, 1-35
wireless communication, 2-5

monitor configuration, 6-2

creating a monitor location, 6-4
creating an installation table, 6-6
MLI device, 6-19
pressure device, 6-18
selecting devices, 6-11
ultrasonic device, 6-14
velocity device, 6-15

Monitor Status Report, 8-5
monitor troubleshooting, 8-20
mounting monitor

manhole rim, 7-5
manhole wall, 7-2

N

National Fire Protection Association

(NFPA), 1-2

new product warranty, 1-35

O

out-of-warranty repairs, 1-36

P

pipe

conditions, 3-4
dimensions, 3-4
noises, 3-3
shape, 3-4
table, 6-6

port selection, 6-20
power

12-volt battery pack, 2-10
9-volt battery pack, 2-10
external DC, 2-11
replacing battery pack, 8-5

pressure depth sensor

configuring, 6-18
installation, 3-20
mounting sensor to the ring, 3-20
replacing the desiccant in the dryer

tube, 8-13

replacing the dryer tube, 8-12
special installation, 3-35

1/2-band mount, 3-38
3/4-band mount, 3-35

specifications, A-8

Profile software

starting, 6-2

PVC conduit, 4-6

Advertising