ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 195

Advertising
background image

8-10

ADS FlowShark IS Manual

10. (applies only to the 12-volt battery pack) Connect the PCB to

the replacement battery pack and then secure the PCB to the

side of the pack with the red band. When converting the

monitor to a 12-volt battery pack from the 9-volt battery pack,

the PCB should already be attached to the new battery pack.

11. (applies only to the 12-volt battery pack) Run the loose cable

from the battery pack through the hole in the underside of the

retainer plug, and then seat the retainer plug on top of the

battery pack. Be sure to pull through the excess cable before

fully seating the plug.

12. Lower the new or replacement battery pack into the canister.

Consider the following:

When converting to the new 12-volt battery pack, be sure

to insert the battery pack into the new, extended canister

included with the conversion kit.

When using a replacement 9-volt battery pack, install and

orient the new battery pack so that the cable standoff is in

the marked location.

13. Connect the battery pack to the monitor, and then pull up the

excess battery cable.

14. Feed the cable into the unit while slowly lowering the chassis

into the canister. Align the cable standoff with the notch in the

chassis bottom plate (when applicable), seat the unit, and align

the top bolts. Be sure not to pinch the battery cable with the
chassis!

15. Connect with the monitor remotely or on site using the IS PC

communication cable (ADS p/n 106228 rev H5) to verify

communication and check the new internal voltage. The

internal voltage should be well above 6.5 volts. Refer to the

end of Chapter 4, Communication, for instructions on attaching

the IS PC communication cable to the monitor and laptop

computer.

16. Tighten the bolts to approximately 20-inch pounds to secure the

chassis to the canister.

Advertising