C h a p t e r 7 monitor installation, Monitor installation – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 177

Advertising
background image

7-1

C H A P T E R 7

Monitor Installation

After installing the sensors and establishing communications, install

the ADS

®

FlowShark

®

IS monitor in the manhole. The monitor

mounts inside the manhole by an aluminum mounting bracket

attached to the monitor and bolted to the manhole wall or rim. The

following procedures for monitor installation apply to most sites.

However, because manholes differ in many ways, some sites may

require the installer to implement slight modifications to the

standard installation technique.
Before installing the monitor at the site, activate the monitor to

verify that the monitor is configured correctly for the application

and that the battery pack is operating at an adequate voltage. Make

any necessary changes to the configuration before mounting the

unit. Refer to Chapter 8, Maintenance and Troubleshooting, for

information on replacing the battery pack, when necessary.

Note:

Manhole and sewer system work involves confined

space entry and is inherently dangerous. Therefore,

installers and technicians must comply with all federal,

state, and municipal regulations concerning confined space

entry. ADS is not responsible for any injuries, damages,

claims, or liability resulting directly or indirectly from the

use of this installation guide or the installation of any ADS

equipment.

Advertising