Typical installation, Dc power requirements – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 125

Advertising
background image

5-2

ADS FlowShark IS Manual

Typical Installation

A typical external power installation includes the following:

A single-phase, 120-volt AC power line terminated at a pole

or post close to the manhole in which the monitor is installed.

An AC distribution device (i.e., disconnect, fuse box, or

breaker box on the pole/post.

A ground rod installed next to the pole/post bonded to the

distribution device.

An AC to 12V DC converter on the pole/post. ADS

recommends using an ADS Power Supply (p/n 5000-0727).

A cable (ADS p/n 5000-0697) connecting the external DC

power source to the EMU. ADS offers a 10-foot long, 0.25-

inch diameter external power cable (ADS p/n 5000-0697) with

an ethylene/propylene copolymer jacket.

Note:

All work necessary to run AC power to the pole

and wire into an approved AC distribution device (i.e.,

disconnect, fuse, or breaker) should be performed by a

licensed electrician. Typically, an electrical permit from

the collection system owner or power authority is required

to install a pole and/or electrical equipment next to a site.

DC Power Requirements

The IS FlowShark system requires a power source capable of

supplying a minimum of 1 ampere of 12-volt regulated DC power

(as measured/available at the EMU, not at the power source output).

For long cable runs, size the supply and cabling to ensure that line

losses do not reduce the net power available to the EMU. If the

application will not involve an ADS Power Supply (ADS p/n 5000-

0727), choose a high-quality industrial type power supply with

ripple no greater than 250mV P-P.

Advertising