ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 230

Advertising
background image

In-2

ADS FlowShark IS Manual

communication, 4-1

direct, 2-2
setting parameters, 6-20
viewing logs, 6-45
wireless, 2-2, 2-5, 4-2

communication cable, 4-4

connecting to EMU, 4-9
installation, 4-4
route, 4-2

communication interface board

specifications, A-6

Communication Interface/Barrier

box, 4-8

compliance

ATEX, 1-12
FCC, 1-9
FCC Part 15, 1-9
GSM/GPRS modem, 1-10

component-level service, 1-7
conduit, 4-6
configuration, 6-2

creating a monitor installation

table, 6-6

creating a monitor location, 6-4
editing the MLI device, 6-19
editing the pressure device, 6-18
editing the ultrasonic device, 6-14
editing the velocity device, 6-15
selecting monitor devices, 6-11

configuring the monitor, 6-2
confined space entry, 3-2, 7-1
confirmation (maintenance), 8-3
connecting to monitor, 4-17

direct, 4-17
via EMU, 4-18

connectors

cleaning and removing moisture,

3-45

monitor, 2-10, 3-45

corbel, 4-6
customer support, 1-7

D

data collection, 6-34

logs, 6-45

data scrubbing, 2-14
DC power, 1-3

requirements, 5-2

Declaration of Conformity, 1-32
depth processing, 2-13
desiccant replacement, 8-13
devices

configuration, 6-11
running diagnostics, 6-26

diagnostics

pressure device, 6-26
ultrasonic device, 6-26
velocity device, 6-26

digital signal processor board, 2-5

specifications, A-3

direct connection to monitor, 4-17
Doppler effect, 2-15
Doppler velocity sensor, 2-15

configuring, 6-15
installation, 3-19
mounting sensor to the ring, 3-19
special installation, 3-35

1/2-band mount, 3-38
3/4-band mount, 3-35

specifications, A-9

downstream pump station, 3-4
dryer tube, 3-46

desiccant replacement, 8-13
end-cap, 3-46, 8-12
replacement, 8-12
securing to monitor, 3-46

E

EC Type Examination Certificate,

1-13

email, ADS Client Services

Department, 1-7

Advertising