Gathering parts and supplies – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 83

Advertising
background image

3-26

ADS FlowShark IS Manual

Performing a special installation involves the following process:

Gathering the parts and supplies

Gathering the tools and equipment

Mounting the ultrasonic depth sensor

Mounting the Doppler velocity sensor

Mounting the pressure depth sensor

Securing the cables to the band

Before beginning the installation, conduct a thorough investigation

of hydraulic and other site conditions. The hydraulics of a site

directly affect the monitor's ability to accurately measure flow depth

and velocity. In addition, measure the horizontal and vertical pipe

dimensions carefully. Even slightly inaccurate pipe dimensions can

significantly skew and misrepresent flow data.

Caution:

Handle all sensors and cables with extreme

care. The sensors and cables contain delicate mechanisms

and electronics. Keep sharp objects away from sensor

cables, and avoid stepping or placing heavy objects on the

cable during installation.

Gathering Parts and Supplies

Be sure to obtain the following supplies before performing a special

installation to prevent any costly delays. When ordering, specify the

FlowShark IS flow monitor special installation hardware.

Quantity

Description

ADS Part Number

1

FlowShark IS flow monitor (includes internal

battery)

5000–IS1–US–01

1

1

monitor mounting bracket

I40–0003

1

IS ultrasonic depth sensor

106186A–30 (ft)

as needed

IS ultrasonic depth sensor extension cable

106137A–xxx

2

Advertising