Installing the emu – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 118

Advertising
background image

Communication

4-15

Installing the EMU

Installing the EMU involves mounting the EMU inside the

customer-supplied enclosure, connecting the communication cable

to the monitor, connecting to the external power source, and

verifying the wireless communication signal. Perform these

activities in the following way:
1. Mount the EMU to the panel inside the customer-supplied

enclosure using appropriate fasteners. The holes in which the

plastic screws go into to secure the cover of the EMU to the

chassis are the same holes through which the fasteners secure

the EMU to the enclosure. Therefore, it may necessary to

remove the EMU cover to insert the fasteners through the holes

to mount the EMU to the enclosure. If this occurs, replace the

cover once the EMU is secured to the enclosure.

One of the holes through which to secure the EMU to the inside panel of the

enclosure

2. (applies only when using external power) Make sure the 9- or

12-volt battery pack has been removed from the monitor.

Warning:

Failing to remove the battery pack from the

monitor before applying external power will damage both

the battery pack and the monitor.

3. Connect the monitor end of the communication cable to the

COMM

port on the top of the monitor. Wrap rubber stretch

tape around the entire cable connection, extending 1 to 2 inches

onto the cable beyond the connection.

Advertising