Required hardware, Test setup – Altera High-Speed Development Kit, Stratix GX Edition User Manual

Page 30

Advertising
background image

4–2

Quartus II Version 3.0

Altera Corporation

User I/O

High-Speed Development Kit, Stratix GX Edition User Guide

LEDs, while the other pair increments or decrements the counter shown
on the 7-segment display. The dipswitches enter numbers on each
device’s 7-segment display.

Required Hardware

In addition to the board, you need the Altera-provided ATX power
supply.

Test Setup

Perform the following steps to set up the user I/O test.

1.

Set the switches as shown in Table 4–1 for the user I/O test.

2.

Connect the power supply to the board.

3.

Confirm that the Stratix and Stratix GX devices have finished
configuration (the GX_CONF_DONE (D7) and S_CONF_DONE
(D6) LEDs illuminate as shown in Figure 4–1).

Figure 4–1. GX_CONF_DONE, S_CONF_DONE & User I/O LEDs

PB0

PB2

PB1

PB3

S_CONF_DONE

GX_CONF_DONE

Advertising