Required hardware, Test setup – Altera High-Speed Development Kit, Stratix GX Edition User Manual
Page 30
4–2
Quartus II Version 3.0
Altera Corporation
User I/O
High-Speed Development Kit, Stratix GX Edition User Guide
LEDs, while the other pair increments or decrements the counter shown
on the 7-segment display. The dipswitches enter numbers on each
device’s 7-segment display.
Required Hardware
In addition to the board, you need the Altera-provided ATX power
supply.
Test Setup
Perform the following steps to set up the user I/O test.
1.
Set the switches as shown in Table 4–1 for the user I/O test.
2.
Connect the power supply to the board.
3.
Confirm that the Stratix and Stratix GX devices have finished
configuration (the GX_CONF_DONE (D7) and S_CONF_DONE
(D6) LEDs illuminate as shown in Figure 4–1).
Figure 4–1. GX_CONF_DONE, S_CONF_DONE & User I/O LEDs
PB0
PB2
PB1
PB3
S_CONF_DONE
GX_CONF_DONE