Finishing test & breakdown, Finishing test & breakdown –35 – Altera High-Speed Development Kit, Stratix GX Edition User Manual

Page 79

Advertising
background image

Altera Corporation

Quartus II Version 3.0

5–35

Perform the Production Diagnostic Tests

Finishing Test & Breakdown

Completed Testing of 240 Cylinders
Completed Testing of 260 Cylinders
Completed Testing of 280 Cylinders
Completed Testing of 300 Cylinders
Completed Testing of 320 Cylinders
Completed Testing of 340 Cylinders
Completed Testing of 360 Cylinders
Completed Testing of 380 Cylinders
Completed Testing of 400 Cylinders
Completed Testing of 420 Cylinders
Completed Testing of 440 Cylinders
Completed Testing of 460 Cylinders
Completed Testing of 480 Cylinders
Completed Testing of 495 Cylinders

Comparison Complete!!!
+

nios-run: exiting.

13. Press reset (Stratix_PB_0) to stop the test.

14. Press the Ctrl + C keys in the shell to exit the test program.

15. If this test passes, write the word “PASS” in the column under

Stratix in the row Stratix Nios Compact Flash in the worksheet.

Finishing Test &
Breakdown

You have completed all of the production tests. Perform the following
steps to break down the test setup.

1.

Close the Programmer.

2.

Close the Quartus II software.

3.

Turn off power to the board.

4.

Detach all of the SMA cables, the PMC card, the 10/100-Mbit
Ethernet network-interface card, the DDR DIMM module, the
ByteBlaster II cable, all loopback cards, the compact flash card, the
serial cable, and the power supply.

Advertising