Perform the standard tests, User i/o, Perform the standard tests –10 – Altera High-Speed Development Kit, Stratix GX Edition User Manual

Page 54

Advertising
background image

5–10

Quartus II Version 3.0

Altera Corporation

Perform the Standard Tests

High-Speed Development Kit, Stratix GX Edition User Guide

Figure 5–14. Board Completely Set Up

21. Power up the board by moving switch SW3 to the on position. The

board power ups with all of the user LEDs illuminated and the
7-segment displays turned on.

The board is now set up and you are ready to perform the tests.

Perform the
Standard Tests

In this section you will perform all of the standard tests. For each test, you
will load a SOF onto the board. These SOFs are located in the
Stratix_GX_kit\test_designs\standard_test_designs\standard_sofs
directory.

1

Table 5–1 on page 5–36 is a worksheet for the tests. You should
have a printed copy of this worksheet when you perform the
tests so that you can note the test results in the appropriate
row/column in the worksheet.

User I/O

For this test, perform the following steps.

1.

Run the Quartus II software. Keep the software open until you
finish all of the tests.

2.

Choose Programmer (Tools menu). Leave the Programmer open
until you finish all of the tests.