Change history – IAI America RCS3PCR-SS8C User Manual

Page 254

Advertising
background image

246

Change History

Change History

May 2010

Fifth edition

Added information on RCS3 and RCS3CR actuators.

June 2010

Sixth edition

P. 25

Changed the maximum speed of RCS3 and RCS3CR at lead
30.
1790 mm/s

1800 mm/s

P. 56

Changed the rates of suction.
SS8, lead 10 mm: 90 Nl/min

80 Nl/min

SS8, lead 30 mm (speed not exceeding 1500 mm/s):
150 Nl/min

160 Nl/min

SS8, lead 30 mm (speed exceeding 1500 mm/s): 190 Nl/min
(added)

November 2010

Seventh edition

Important Note

Eighth edition

Added “Adding Grease on the Clean Room Specification.”

P. 9

Added 6, “Do Not Loosen the Mounting Screws of Micro-Switches
or Bend the Switch Dogs” under “Handling Precautions.”

P. 19

Added 2, “Motor/Encoder Cables.”
Added note *1.

P. 23

Added options “VL” and “VN.”

P. 24 to 32

Added SA5 and SA6 specifications of lead 20.

P. 36

Added (7), “Actuator precision.”

P. 37

Added 3, “Life.”

P. 54

Added [Connecting to SCON/SSEL Controller] and [Connecting
to X-SEL Controller].

P. 57 to 64

Added 7, “Setting the Home.”

P. 66 to 68

Added 9, “Options.”

P. 73

Added 11.4, “Adjusting the Stainless Sheet.”

P. 189

Added 11.10.10, “Replacing the Motor of the Motor Straight Type
(Built-in Type).”

P. 190

Added 12, “Appendix – External Dimensions.”

P. 9

Change made to duty calculation

P. 25, 26

TA added to encoder types, Caution added

April 2011

June 2011

Tenth edition

July 2011

Eleventh edition

P. 44

P. 44

P. 232 to 233

Contents of caution for vertically oriented mount changed.

Change in ceiling installation availability

Contents

changed

in 13. Warranty

î1RWLQVWDOODEOHĺޓޓ: Daily inspection is required)

May 2011

Ninth edition

Revision Date

Description of Revision

Advertising