JLG 1500SJ Service Manual User Manual
Page 107
Advertising
SECTION 3 - CHASSIS & TURNTABLE
3121262
– JLG Lift –
3-59
17. Prepare the closing cover fitting the O-ring 5-582
suitably greased and lock it with the shimming ring.
Lubricate the bearings.
18. Fit the O-Ring 2-177 suitably greased, mount the
cover locking it with the BR250 ring.
19. Fit the O-Ring 2-163 suitably greased, onto the
motor coupling flange S-D LC/KC. Mount the flange
on the spindle with 6 M8x25 socket cap screws at
the torque of 2.4daNm with LOCTITE 243 Insert the
pin and carry out the rotation test according to PGQ-
22 standard.
20. Mount the release cover fastening it with 2 M6x20
hexagonal screws at the torque of 1daNm. Mount
the 1/4"GAS plugs on the cover at the torque of
1daNm.
Advertising