JLG 1500SJ Service Manual User Manual

Page 107

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121262

– JLG Lift –

3-59

17. Prepare the closing cover fitting the O-ring 5-582

suitably greased and lock it with the shimming ring.
Lubricate the bearings.

18. Fit the O-Ring 2-177 suitably greased, mount the

cover locking it with the BR250 ring.

19. Fit the O-Ring 2-163 suitably greased, onto the

motor coupling flange S-D LC/KC. Mount the flange
on the spindle with 6 M8x25 socket cap screws at
the torque of 2.4daNm with LOCTITE 243 Insert the
pin and carry out the rotation test according to PGQ-
22 standard.

20. Mount the release cover fastening it with 2 M6x20

hexagonal screws at the torque of 1daNm. Mount
the 1/4"GAS plugs on the cover at the torque of
1daNm.

Advertising