JLG 1500SJ Service Manual User Manual

Page 261

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121262

– JLG Lift –

4-15

2. While lifting the boom into position, begin to route

the hoses into position so they can be inserted into
the powertrack.

3. Line up the boom pivot fittings and install the boom

pivot pin. Apply JLG Threadlocker P/N 0100019 to
the bolt threads and secure the pin in place with the
keeper pin and bolt. Torque the bolt to 285 ft.lbs.
(388 Nm).

4. Raise the boom enough to gain access to the lift cyl-

inder rod pivot fitting.

5. Attach a lifting device to the lift cylinder barrel. Lift

the lift cylinder up to align the lift cylinder rod pivot
fittings.

6. Install the lift cylinder rod pivot pin and secure it in

place with the keeper pin and bolt.

Advertising