20 jib rotator torquing procedure, Jib rotator torquing procedure -105, Jib rotator torque -105 – JLG 1500SJ Service Manual User Manual

Page 351

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121262

– JLG Lift –

4-105

4.20 JIB ROTATOR TORQUING PROCEDURE

See Figure 4-31., JIb Rotator Torque

1. Torque the center bolt to 350 ft.lbs. (475 Nm).

2. Torque the bottom bolts in a crossing star pattern to

170 ft.lbs. (230 Nm).

3. Torque the top bolts in a crossing star pattern to 300

ft.lbs. (410 Nm).

4. Torque the center bolt to a final torque of 700 ft.lbs.

(950 Nm).

Figure 4-31. JIb Rotator Torque

Advertising