JLG 1500SJ Service Manual User Manual

Page 152

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-104

– JLG Lift –

3121262

6. Lay the jib control valve aside on the jib. Secure it in

place so it does not fall.

7. Disconnect the jib protractor sensor linkage from the

boom.

8. Remove the bolt and keeper pin securing the jib

level cylinder pivot pin and remove the pin. Place
blocking or a soft material under the cylinder rod to
protect the rod surface from being scratched.

NOTE: The jib and platform assembly weighs approximately

2100 lbs. (953 kg.).

Advertising