JLG 1500SJ Service Manual User Manual

Page 301

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121262

– JLG Lift –

4-55

4. Attach a lifting device to the front of the jib and align

the jib level cylinder attachment fittings. Install the
pivot pin. Apply JLG Threadlocker P/N 0100019 to
the bolt threads and secure the pin in place with the
keeper pin and bolt. Torque the bolt to 165 ft.lbs.
(224 Nm).

5. Place the mounting bracket on the jib valve and bolt

the jib valve to the fly boom section.

6. Install the wiring harnesses and hydraulic hoses on

the jib valve as tagged during removal.

7. Install the jib valve protection plate.

8. Perform a boom calibration as described in Section

6 under Calibrating the Boom Sensors.

Advertising