Installation, Installation -63 – JLG 1500SJ Service Manual User Manual

Page 309

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121262

– JLG Lift –

4-63

Installation

1. If installing a new cylinder, test fit the retaining pins

that secure the jib telescope rod to the jib fly boom
to ensure they fit properly. Apply an anti-seize com-
pound to the attachment holes in the cylinder rod.

2. Lift the cylinder into place, adjusting the lifting

device as necessary to maintain balance.

3. Fasten the cylinder barrel to the jib base boom with

the attaching bolts. Do not tighten the bolts at this
time.

4. Connect the hydraulic hoses to the cylinder as

tagged during removal.

5. Lower the jib enough to enable easier access to the

attachment holes in the jib fly boom.

6. Extend the cylinder enough to align the attachment

holes in the jib fly boom with those in the end of the
cylinder rod.

7. Install the retaining pins and secure them in place

with the retaining rings.

8. Apply JLG Threadlocker P/N 0100011 to the bolts

securing the cylinder barrel to the jib base boom
and torque the bolts to 95 ft.lbs. (130 Nm).

9. Function check the cylinder to ensure it operates

properly and there is no leakage.

Advertising