JLG 1500SJ Service Manual User Manual

Page 83

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121262

– JLG Lift –

3-35

19. Assemble the 1st reduction assembly (16).

20. Insert the 1st stage sun gear (10).

21. Assemble the O-ring seal (9) into its seat in the end

cover (7).

22. Place the end cover (7) on the gearbox housing

(23).

23. Tighten the 10 socket head screws M10x25

(1),grade 12,9, by a torque wrench at 62.7 ft.lbs.
torque (85 Nm).

24. Insert the plugs (6) into the oil draining-filling holes

of the end cover (7). Torque the plugs to 52 ± 7
ft.lbs. (70±10 Nm).

Advertising