JLG 1500SJ Service Manual User Manual

Page 163

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121262

– JLG Lift –

3-115

20. While lifting the boom into position, begin to route

the hoses into position so they can be inserted into
the powertrack.

21. Line up the boom pivot fittings and install the boom

pivot pin. Apply JLG Threadlocker P/N 0100019 to
the bolt threads and secure the pin in place with the
keeper pin and bolt. Torque the bolt to 285 ft.lbs.
(388 Nm).

22. Raise the boom enough to gain access to the lift cyl-

inder rod pivot fitting.

23. Attach a lifting device to the lift cylinder barrel. Lift

the lift cylinder up to align the lift cylinder rod pivot
fittings.

24. Install the lift cylinder rod pivot pin. Apply JLG

Threadlocker P/N 0100019 to the bolt and secure
the pivot pin in place with the keeper pin and bolt.
Torque the bolt to 285 ft.lbs. (388 Nm).

Advertising