JLG 1500SJ Service Manual User Manual
Page 164
SECTION 3 - CHASSIS & TURNTABLE
3-116
– JLG Lift –
3121262
25. Connect the hoses to the main valve and pressure
filter as tagged during removal.
26. Reconnect the negative battery terminal.
27. Using auxiliary power, lower the boom to horizontal.
28. Attach an adequate lifting device to the jib and posi-
tion it in front of the boom.
29. Place something under the front of the jib that will
allow it to slide or move along the ground easily.
Attach a lifting device to the rear of the jib, allowing
the front to pivot on the ground.
30. Lift the jib into position on the boom fly section and
install the jib pivot pin. Apply JLG Threadlocker P/N
0100019 to the bolt and secure the pivot pin in place
with the keeper pin and bolt. Torque the bolt to 165
ft.lbs. (224 Nm).