11 jib straight shimming procedure, Jib straight shimming procedure -66 – JLG 1500SJ Service Manual User Manual

Page 312

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-66

– JLG Lift –

3121262

4. Raise the cylinder into position to allow the jib lift

barrel pivot pin to be installed and install the pin.

5. Secure the pin in place with the keeper pin. Apply

JLG Threadlocker P/N 0100011 to the retaining bolt.
Install the retaining bolt to secure the keeper pin and
torque to 165 ft.lbs. (224 Nm).

6. Remove the lifting device supporting the cylinder

and the lifting device supporting the jib.

7. Function check the cylinder to ensure it operates

properly and there is no leakage.

4.11 JIB STRAIGHT SHIMMING PROCEDURE

See Figure 4-17., Jib Straight Shimming.

1. Install the jib lock cylinder and fully extend the rod

through the bearing housings in the jib rotator and
jib pivot.

2. Align the jib pivot straight with the jib assembly.

3. Insert a 16 gauge shim between the wear pad and

pivot pad mount.

4. Add shims (16 gauge and 20 gauge) as required to

fill the gap between the wear pad and the edge of
the bottom plate of the jib rotator.

5. Shim until the thinnest shim can not fit. Do not over

shim and cause jib pivot and jib assembly misalign-
ment.

6. When shimmed properly, the jib pivot and jib assem-

bly should line up straight as shown below.

ALIGN JIB PIVOT STRAIGHT
WITH JIB ASSEMBLY AS SHOWN

Advertising