Section 4. boom & platform, 1 boom maintenance, Removal of the boom assembly – JLG X20JP - X600AJ Service Manual User Manual

Page 154: Disassembly of the main boom

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121623

– JLG Lift –

4-1

SECTION 4. BOOM & PLATFORM

4.1 BOOM MAINTENANCE

IF PERFORMING MAINTENANCE ON THE BOOM, DO NOT USE A
LIFTING DEVICE TO LIFT THE BOOMS UNLESS THE HOLDING
VALVES HAVE BEEN REMOVED FIRST. FAILURE TO DO SO WILL
RESULT IN SEVERE DAMAGE TO THE BOOM.

Removal of the Boom Assembly

1. Remove the platform and platform support as fol-

lows:

a. Disconnect electrical cable from control con-

sole.

b. Tag and disconnect the hydraulic lines running

to the rotate cylinders. Cap the hydraulic lines
and ports.

c. Using an overhead crane or suitable lifting

device, use nylon support straps to support the
platform/support.

NOTE: When removing the retaining pin from the rod end of the

level cylinder, make sure the cylinder is properly sup-
ported.

d. Remove bolts and keeper pins that secures the

retaining pins. Using a suitable brass drift and
hammer, remove the retaining pins from the plat-
form support.

2. Remove the boom from the turntable as follows:

a. Disconnect wiring harness from ground control

harness connector.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF CON-
TAMINANTS INTO SYSTEM.

b. Tag and disconnect hydraulic lines from boom

to control valve. Use a suitable container to
retain any residual hydraulic fluid. Cap all
hydraulic lines and ports.

c. Using a suitable lifting equipment, adequately

support boom weight along entire length.

d. Remove the bolts and keeper pins securing the

lift cylinder pivot pin. Using a suitable brass drift
and hammer, remove the pivot pin from the
lower boom.

e. Remove hardware securing the level link pivot

pin. Using a suitable brass drift and hammer, remove the
pin from the level link and turntable.

f. Remove hardware securing the lower boom pivot

pin. Using a suitable brass drift and hammer, remove pin
from the turntable.

g. Using all applicable safety precautions, carefully

lift boom assembly clear of turntable and lower to ground
or suitable supported work surface.

Disassembly of the Main Boom

1. Loosen jam nuts on aft end of fly boom wear pad

adjustment and loosen adjustments.

2. Using a portable power source, attach hose to tele-

scope cylinder port block. Using all applicable
safety precautions, activate hydraulic system and
extend cylinder to gain access to cylinder rod retain-
ing pin. Shut down hydraulic system.

3. Carefully disconnect hydraulic hose from retract port

of cylinder. There will be initial weeping of hydraulic
fluid which can be caught in a suitable container.
After initial discharge, there should be no further
leakage from the retract port.

4. Remove hardware securing telescope cylinder to

the fly boom section, then remove pin from fly.

5. Remove hardware securing telescope cylinder to

the base boom section.

WHEN REMOVING TELESCOPE CYLINDER FROM BOOM SEC-
TIONS. CARE SHOULD BE TAKEN NOT TO LEAVE CYLINDER REST
ON POWERTRACK WHICH COULD CAUSE DAMAGE TO POW-
ERTRACK.

1. Using a suitable lifting device, remove telescope cyl-

inder from boom sections.

2. Using a piece of tape, mark the length of hoses and

wires from front of fly boom and bottom of base
boom for reassembly.

3. Remove hardware securing the front wear pads on

base boom section, remove wear pads.

Advertising
This manual is related to the following products: