SECTION 4 - BOOM & PLATFORM

4-12

– JLG Lift –

3121623

vent it from coming out of the socket before it
engages the mounting threads.

Figure 4-18.

22. Connect all the hydraulic lines to the cylinder as

tagged during the removal procedure.

23. Adjust the boom cables as outlined under Section

4.4, ROPES TENSION ADJUSTMENT PROCEDURE.

Installation

1. Using a suitable lifting device, position boom

assembly on upright so that the pivot holes in both
boom and upright are aligned.

2. Install boom pivot pin, ensuring that location of hole

in pin is aligned with attach point on upright.

3. If necessary, gently tap pin into position with soft

headed mallet. Secure pin mounting hardware.

4. Connect all wiring to the ground control box.

5. Connect all hydraulic lines running along side of

boom assembly.

6. Using all applicable safety precautions, operate lift-

ing device in order to position boom lift cylinder so
that holes in the cylinder rod end and boom struc-
ture are aligned. Insert the lift cylinder pin, ensuring
that location of hole in pin is aligned with attach
point on boom.

7. Align holes in boom structure with hole in master

cylinder. Insert the master cylinder pin, ensuring that
location of hole in pin is aligned with attach point on
boom.

8. Adjust retract and extend cables to the proper

torque. Refer to Section 4.4, ROPES TENSION
ADJUSTMENT PROCEDURE.

9. Using all applicable safety precautions, operate

machine systems and raise and extend boom fully,
noting the performance of the extension cycle.

10. Retract and lower boom, noting the performance of

the retraction cycle.