7 load cell and footswitch removal/installation, Removal load cell, Installation load cell – JLG X20JP - X600AJ Service Manual User Manual

Page 177: Removing footswitch, Installation footswitch

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-24

– JLG Lift –

3121623

4.7 LOAD CELL AND FOOTSWITCH

REMOVAL/INSTALLATION

Removal load cell

1. Turn the machine off and unplugged from the power

supply.

2. Remove the basket of the

machine (see dismantling basket).

3. Remove screws (2) and remove cover (3).

4. Remove the load cell (4) by disconnecting

the wiring from ECM3.

Installation load cell

1. Install the load cell (4) and stop with cover (3) and

secure with screws (2).

2. Remount the load cell (4) connecting the electrical

wiring to ECM3.

3. Reinstall the

basket. (See section basket installation)

Figure 4-27.

Removing footswitch

1. Turn the machine off and unplugged from the power

supply.

2. Remove the basket of the machine. (See

paragraph basket removal).

3. Remove screws (5) securing support footswitch (6).

4. Loosen the fixing screw foot (1).

5. Remove the footswitch (1) disconnecting

the wiring from ECM3.

Installation footswitch

1. Fit and secure with screw the the footswitch (1) to

the support footswitch (6).

2. Secure with screws (5) footswitch support (6) to

the basket support(7).

3. Connect the wiring to ECM3.

4. Reinstall the basket. (See

paragraph basket installation).

Advertising
This manual is related to the following products: