Calibrating Multiple EAGLE 2s with Different Sensor Configurations • 212

13. You will then be prompted to change the GAS 2 cylinder. The pumps on the

instruments will stop.

If you are calibrating an instrument or instruments in the first bank of 5
docking stations, the following screen will appear. Be sure to change the
calibration cylinder connected to the GAS 2 manifold of the first bank of 5
docking stations.

If you are calibrating an instrument or instruments in the second bank of 5
docking stations, the following screen will appear. Be sure to change the
calibration cylinder connected to the GAS 2 manifold of the second bank of
5 docking stations.

If you are calibrating instruments of the same configuration in both 5-
docking station banks, the following screen will appear. Be sure to change
the calibration cylinder connected to the GAS 2 manifold of each 5-docking
station bank. You will need to change 2 cylinders.

When you have changed the GAS 2 cylinder, click OK. The calibration will
continue and the second GAS 2 calibration gas will be applied to the EAGLE 2
for an automatically defined amount of time based on the type of special
sensor.