Setting Up the PC Controller Program • 30

2s that are currently connected to the PC Controller Program and EAGLE 2s that are
in the database. The SDM-E2s are identified by a number. The instruments are
identified by their serial number. By selecting either the Icon radio button or the
Details radio button, the SDM-E2s and EAGLE 2s can be displayed either as icons or
in a table format that shows various EAGLE 2 parameter details such as station ID,
user ID, the next scheduled bump test date, and the next scheduled calibration date
among others. If the Only Connected Units box is checked, then only instruments that
are currently connected to the PC Controller Program will be shown.

Program Status

Three areas of the main program window indicate the program status. The smaller
area in the lower left below the SDM-E2/EAGLE 2 display area is the message area.
It displays messages that indicate actions and status of the program.

Below this area is the communications port indicator which shows when the program
is communicating with the docking station(s).

To the right of the communications port indicator is the status field. It displays the
current status of the program. It can indicate if the software is in standby mode or if it
is downloading data among other indications.

Fitting Indicators

To the right of the status field are 3 round fitting indicators. They correspond to the
AIR and GAS fittings on the back of the SDM-E2. They indicate whether the
corresponding solenoid is activated so it can allow gas to flow through the fitting it
controls. When the indicator is green, the fitting is active. When the indicator is blank,
the fitting is not active.

Setting Up the PC Controller Program

Once the program is installed, you must set up the program for your system. Setting
up the PC Controller Program consists of the following tasks:

setting up the parameter configuration

NOTE:

Only the Parameter tab of the Configuration Window is discussed in
this section. See “Config Window” on page 177 for a description of the
other tabs in the Configuration Window.

setting up the SDM-E2 display order

defining which calibration gas cylinders will be used

Setting Up the Configuration

1.

Launch the program as described in “Launching the SDM-E2 Docking Station
PC Controller Program” on page 27.

NOTE:

It is not necessary to turn on the SDM-E2 docking stations if you are
only performing configuration setup.