RKI Instruments SDM-E2 User Manual

Page 52

Advertising
background image

47 • Instrument Placement for Bump Testing or Calibration

To save the instrument list as a .csv file:

1.

Click the Save icon located just below the Exit button.

2.

Choose a file path and enter a file name and click Save.

To save the instrument list to the clipboard:

1.

Click the Clipboard button located just below the Exit button. The serial
number, model, station ID, user ID, next bump test date, next calibration date,
the calibration interval, and the data logging interval time for each instrument
in the main program window will be saved to the clipboard in a table format.

2.

Open a spreadsheet program such as Excel or a word processing program
such as Word and paste the clipboard data into it.

Instrument Placement for Bump
Testing or Calibration

NOTE:

The following descriptions assume you have configured your manifold
system appropriately for the number and configuration of your EAGLE
2s. See “Assembling a Manifold for Multiple SDM-E2 Units” on page 12
for a discussion of configuring manifolds for the SDM-E2.

If you have 5 or less EAGLE 2s with the same sensor configuration, in order to
streamline the bump testing and calibration process, it is recommended that the
EAGLE 2s be placed in the same 5-docking station manifold bank.

If you have more than 5 EAGLE 2s with exactly the same sensor configuration, you
will need to bump test and calibrate those instruments using both sets of docking
station manifold banks. To bump test or calibrate them all at the same time, you will
need 2 of each required calibration cylinder since one set will be used for the first

Advertising