Figure 53 – Rockwell Automation MV SMC Flex Motor Controller (for Series K or later) User Manual

Page 139

Advertising
background image

Rockwell Automation Publication 1560E-UM051F-EN-P - June 2013

129

Troubleshooting

Chapter 9

Figure 53 - Removal of SCR (1000 to 240 V, 180/360A)

To Remove SCR:
• Remove shorting bar hardware
• Pry opposing heatsinks apart
• Extract SCR

To Insert New SCR:
• Apply thin film of electrical joint compound to

surfaces of SCR

• Install SCR so that it is seated in locating pin of

heatsink (note orientation of SCR).

• Pry heatsinks to close gap, ensuring that SCR is

seated properly in both its locating pins.

• Rotate SCR so that all leads have same direction.

SCR 2

SCR 1

Shoring Bar Hardware

Heatsink 1

Heatsink 3

Heatsink 2

Locating Pin

Advertising