IT Protection

The drive’s IT protection dictates the amount of overload capacitors and duty
cycle. Ratings are in the tables listed below.

Figure 16

shows expected times.

Figure 16 - IT Curve

Time On (s) = time, in seconds, at current level shown
Time Off (s) = time, in seconds, at 100% current
Duty Cycle% = time on / (time on + time off ) x 100

The On Time/Off Time ratio is fixed. If only 1/2 of the listed time is spent at a
given level, only 1/2 of the off time is necessary to reset the cycle.

Current (%)

Time On (s) Time Off (s)

Duty Cycle (%)

150

3.0

57

5.0

145

3.4

58

5.6

140

3.9

59

6.3

135

4.7

61

7.1

130

5.7

63

8.3

125

7.4

66

10.0

120

10.4

73

12.5

115

17.8

89

16.7

114

20.7

95

17.9

113

24.7

104

19.2

112

3038

117

20.8

111

40.7

138

22.7

110

60.0

180

25.0

109

69.2

180

27.8

108

81.8

180

31.2

107

100.0

180

35.7

106

128.6

180

41.7

105

180.0

180

50.0

104

300.0

180

62.5

103

900.0

180

83.3

102.5

4500000.0

180

100.0

102.5%

104%

106%

108%

110%

112%

114%

120%

130%

140%

150%

10000000.0

1000000.0

100000.0

10000.0

1000.0

100.0

10.0

1.0

Current (%)

Time (sec)

Advertising