Mounting hardware inventory, Tools list, Mounting location – Welch Allyn Connex Integrated Wall System - User Manual User Manual

Page 26

Advertising
background image

CAUTION Do not remove the cardboard securing the handles on

the left side of the wall system at this time. The cardboard prevents

damage to those instruments during the mounting process.

Mounting hardware inventory

Use these items to mount the wall system.

6 x

Mounting rail bracket

Accessory bin bracket

Screws

Tools list

Use these tools to mount the wall system.

#2 Phillips screwdriver

level

tape measure

stud finder

drill

1/8-inch (3.17 mm) diameter drill bit

Mounting location

Before mounting the wall system, consider the following recommendations to determine the best

mounting location:

Mount the wall system to studs.

Mount the wall system within reach of the AC power outlet. The power cord is 8 ft. (2.44 m)

long.

Avoid brightly lit areas.

Blood pressure tubing is 8 ft. (2.44 m) long.

20 Setup

Welch Allyn Connex

®

Integrated Wall System

Advertising