A.2.6 breaker command and control events, A.2.7 breaker status events – GE Industrial Solutions Entellisys 5.0 User Manual User Manual

Page 282

Advertising
background image

Alarms and events

270

A

A.2.6 Breaker Command and Control Events

A.2.7 Breaker Status Events

Table A-7 Breaker Command and Control Events

Event

Description

Notes and Troubleshooting tips

Breaker Close Command
Issued from HMI For [Breaker
Name]

Logged when an operator issues a close command
for a given breaker

Breaker Open Command
Issued from HMI For [Breaker
Name]

Logged when an operator issues an open
command for the specified breaker

Breaker Trip Command Issued
from HMI For [Breaker Name]

Logged when an operator issues a trip command
for the specified breaker

[Alarm Name] Is In Alarm
Condition

The specified alarm has entered the active
condition.

Attention: Control Power 1
Outage Detected On Battery
Backup

The primary control power source has experienced
an outage and is now operating from the UPS
battery backup.

Attention: Control Power 1 Low
Battery Detected Shutdown in
2 mins

The HMI will shutdown in the specified amount of
time due to impending outage of the UPS battery
backup.

Control Power 1 Power
Restored

Power has been restored to the primary control
power bus.

<USER ID> Requested
Multipoint RELT

Logged by HMI when user initiates RELT

<USER ID> Requested To End
Multipoint RELT

Logged by HMI when user turns off RELT

Table A-8 Breaker Status Events

Event

Description

Notes and Troubleshooting tips

Attention Breaker Open Failed
Shunt Trip

CPU sent an open with shunt trip command to
Messenger, but data sent by Messenger indicates
that breaker did not open

Verify that breaker is in the Test or
Connect position.

Check shunt trip fuse.

Contact GE Post Sales Service (see

How

to contact us on page 2

).

Advertising