GE Industrial Solutions Entellisys 5.0 User Manual User Manual

Page 299

Advertising
background image

Alarms and events description and system troubleshooting guide

287

A

Caution CPUB Synch Clock Err
Backup Clock On

Messenger reports that CPU B is not using the CPU
Synch Clock (event recorded by CPU A)

Verify that CPU B is connected to the CPU
Synch Clock, verify that the CPU Synch Clock
is operating correctly.

Messngr Synchronization OK

Messenger reports that it has successfully
synchronized to one of the CPUs

Messngr Synch Not Locked

Messenger reports that it is not synchronized to
either CPUs

It is normal for this to occur during start-up,
or when an Entellisys Messenger is first
plugged in to the system or rebooted. If it
occurs repeatedly during normal operation,
contact GE Post Sales Service (see

How to

contact us on page 2

).

Time Server Started

Logged when CPU switches to server mode and
starts servicing time synchronization requests

Time Server Stopped

Logged when CPU switches to client mode and
starts polling server for current time

Time Synchronization
Successful

When in client mode CPU logs this event when it
received the time packet from time server for the
first time.

Time Server Not Responding Or
Not Reachable

When in client mode CPU logs this event when
there was no response from time server for time
packet request.

Time Server Not Configured

Logged when server IP address has default value of
0.0.0.0

Breaker Tripped Analog IOC

Messenger reports that it has tripped the breaker
due to an IOC condition (analog circuit)

Breaker Trip Instantaneous
Overcurrent

Messenger reports that it has tripped the breaker
due to an IOC condition

Breaker Trip Backup ST
Overcurrent

Messenger reports that it has tripped the breaker
due to a short time overcurrent condition

Breaker Trip Backup LT
Overcurrent

Messenger reports that it has tripped the breaker
due to a long time overcurrent condition

Breaker Trip Backup Ground
Fault

Messenger reports that it has tripped the breaker
due to a ground fault condition

Caution CPUA Not Rcv From 1 Or
More Messngrs

Messenger reports that CPU A is not receiving data
from at least one Messenger (event recorded by
CPU B)

Check Ethernet connection between
Entellisys Messenger and switch, and the
connection between the switch and CPU A.
Verify that Messenger is powered on and
operating.

Table A-10 Messenger/Breaker Config Status Events

Event

Description

Notes and Troubleshooting tips

Advertising