Rack mounting installation – Anritsu ML2430A User Manual

Page 16

Advertising
background image

The required parts and tools are listed below:

Tools Required:

Small Phillips screw driver
Large Phillips screw driver
Small Phillips torque screw driver 10cNm to 120cNm
Assembly drawing “ML2400A/01 RACK MOUNTED LEFT
OR RIGHT OPTION”

Assembly Procedure

1.

Confirm the correct tools are available and the parts listed above are present. Re-
fer to diagram on page 2-5 throughout this procedure.

2.

Fit the two handles 783-1055 to front plate 49362 and the front rack bracket
C37376 using 4 screws 900-795.

3.

Lay the large support bracket D41473 next to the Power Meter as per the assem-
bly drawing. Note if the PM needs to be mounted on the left hand side of the rack,
simply lay the bracket on the PM’s right side. i.e. a mirror image of the assembly
drawing.

4.

2-4

ML2430A OM

RACK MOUNTING

INSTALLATION

Quantity

(each)

Description

Anritsu Part

Number

Max. Torque

Setting

2

HANDLE, PULL, CHASSIS, PLASTIC, HARDWARE

783-1055

4

SPEED NUT

790-319

8

6-32, SST, WASHER, FLAT

900-345

4

M4, 8.00 MM, PHH, SCREW, FLAT HEAD

900-795

4

DECORATIVE SCREW

900-821

8

M3X8, POS, SST, PATCHLOCK, SCREW, METRIC,
PAN HEAD

905-68

.4lbf.in

[45cN m]

6

M3X5, POS, SST, PATCHLOCK, SCREW, METRIC,
PAN HEAD

905-72

.4lbf.in

[45cN m]

6

SNAP RIVET, PLASTIC

788-575

1

RACK MOUNT, SIDE, BRACKET

C37276

1

REAR SUPPORT, BRACKET, RACK MOUNT

C41449

1

RACK MOUNT, SUPPORT, BRACKET

D41473

1

BRACKET SUPPORT, BASE PANEL

49361

1

FRONT FACE PLATE

49362

1

POWER METER FITTED WITH RACK MOUNT TOP
AND BOTTOM COVERS

ML2430A

Table 2-1 ML2430A-01 Rack Mount Kit Parts List

Advertising