Rack mounting installation – Anritsu ML2430A User Manual

Page 18

Advertising
background image

ML2400A-03 Rack

Mount Installation

This section describes the assembly procedure for fitting two ML2430A Power
Meters (PM) into a instrument rack. The PM’s must be fitted with rack mount top
and bottom covers for the rack mount kit to be fitted. The procedure involves fit-
ting support brackets, two front handles, and two rear support brackets, one to
each PM. The two PM,s which are locked together can then be loaded and se-
cured in the rack position desired. This assembly procedure also provides assem-
bly instructions for fitting a ML2430A to a HP34401A Multimeter and a MF2412A
Microwave Frequency Counter.

The required parts and tools are listed below:

2-6

ML2430A OM

RACK MOUNTING

INSTALLATION

Quantity

(each)

Description

Anritsu Part

Number

Max. Torque

Setting

2

HANDLE, PULL, CHASSIS, PLASTIC,
HARDWARE

783-1055

4

SPEED NUT

790-319

16

WASHER, 6-32UNC, OVERSIZE

900-345

4

M4, 8.00 MM, PHH, SCREW, FLAT HEAD

900-795

4

DECORATIVE SCREW

900-821

16

M3X8, POS, SST, PATCHLOCK, SCREW, MET-
RIC, PAN HEAD

905-68

.4lbf.in

[45cN m]

4

M3X6, POS, SST, PATCHLOCK, SCREW, MET-
RIC, FLAT HEAD

905-69

4

WASHER, M4 SPLIT.

900-807

2

M4X12MM, SCREW, PAN HD

900-806

2

M3.5X8MM, SCREW, PAN HD

905-103

4

M4X10MM, SCREW, FLT HD

905-63

1

RACK MOUNT, SIDE BRACKET

49415

1

RACK MOUNT, CENTRE, FRT, BRACKET

49413

1

SPACER PLATE

49439

1

RACK MOUNT, CENTER, FRONT, BRACKET

C37275

2

RACK MOUNT, SIDE, BRACKET

C37276

1

RACK MOUNT, CENTER, BRACKET

C37277

1

RACK MOUNT, CENTER, BRACKET

C37279

2

REAR SUPPORT, BRACKET, RACK MOUNT

C41449

2

POWER METER FITTED WITH RACK MOUNT
TOP

Table 2-2 ML2430A-03 Rack Mount Kit Parts List

Advertising