Lull 944E-42 Service Manual User Manual

Page 189

Advertising
background image

6.13

Model 644E-42/944E-42

Rev. 6/04

Transmission: ZF 4WG-92/98 TSC & Transfer Case: ZF TB92-I4

23. Reassemble the driveshafts. Refer to Section 5.4.4,

“Drive Shaft Installation,” for front and rear drive
shafts.

24. Position the air cleaner hose over the turbocharger

intake opening. Install the air cleaner, aligning the
mounting band with the mount on the firewall. Slide
the lower capscrew into the slot and reassemble the
upper capscrew (17). Torque the mounting
capscrews to 11-19 lb-ft (15-25 Nm). Torque the air
cleaner hose clamp (18) to 75 lb-in (8,8 Nm).
Reconnect the wire harness to the air intake sensor
(19).

25. Reassemble the engine hood to the firewall. Refer to

Section 4.8.2, b. “Engine Hood Installation.”

26. Carefully remove the vehicle from the blocks and

lower back to the ground.

27. If the vehicle has dual batteries, connect both

negative battery cables (20 and 21) to both
batteries.

Connect the lower negative battery cable (20) to the
negative (-) terminal on the lower battery (22). Swing
the upper battery box (23) in and make sure that the
lip (24) on the upper battery box slides below the
knob (25). Secure in place with the knob (25).

MU1770

17

18

19

MU0650

20

21

22

23

24

25

Advertising
This manual is related to the following products: