Electrical system – Lull 944E-42 Service Manual User Manual

Page 589

Advertising
background image

9.79

Model 644E-42/944E-42

Rev. 6/04

Electrical System

Continued on 9.81

Not

OK

If

OK

Repair/replace

open cab harness.

If

OK

Repair/replace

open cab harness.

Replace ignition

switch.

If

OK

If

OK

If

OK

Replace engine

start relay.

Replace 15

amp ignition

control

fuse (F2).

Not

OK

Check power at

wire [PB6A] (RED/ORG) at

park brake switch.

Check for power at wire

[ST3] (BLU/ORG) at engine

start relay.

Check for power at engine

start relay at wire [ST2] (BLU).

Check power at

wire [NS1] (BLU/ORG) at

neutral start relay.

Check power at

wire [NS2] (BLU/TAN) at

neutral start relay.

Check power at

wire [NS1] (BLU/ORG) at

park brake switch.

Check power at

wire [TR7A] (GRY)

at neutral start

relay.

Continued from 9.77

With ignition switch

in start position,

check starter

solenoid terminal,

wire [ST2] (BLU)

connection for

battery voltage.

Repair/replace

open cab harness.

Check for power at engine

start relay at wire [ST1] (RED).

Not OK

Not OK

If

OK

Repair/replace

ECM vehicle

power harness.

Not OK

Check power at

wire [NS2] (BLU/TAN) at

female bulkhead connector.

Repair/replace

ECM vehicle

power harness.

Not

OK

If

OK

Not OK

Repair/replace

ECM vehicle

power harness.

If

OK

Not OK

Not OK

Not OK

Check power at

wire [PB6] (RED/WHT) at

ignition switch.

Check power at

wire [PB1] (RED/TAN) at

ignition switch.

Not OK

Replace park

brake switch.

If

OK

Not OK

If OK

If

OK

Replace neutral

start relay.

Before troubleshooting any
electrical circuit, ALWAYS
begin by checking the
following:

1. All connections relating to

circuit are clean and tight.

2. All grounding straps are

intact and securely
fastened, refer to Section
9.1.12, “General Overview
(Vehicle Ground Strap
Locations).”

Advertising
This manual is related to the following products: