Refrigerant Connections

23

Liebert

®

CRV

6.2.3 Installing Piping

The following operations must be carried out by an experienced refrigeration technician.

NOTICE

Risk of oil contamination with water. Can cause equipment damage.
The piping must not be open to the atmosphere for extended periods because the Liebert CRV

requires POE (polyol ester) oil. POE oil absorbs water at a much faster rate when exposed to

air than previously used oils. Because water is the enemy of a reliable refrigeration system,

extreme care must be used when opening systems during installation or service. If water is

absorbed into the POE oil, it will not be easily removed and will not be removed through the

normal evacuation process. If the oil is too wet, it may require an oil change. POE oils also

have a property that makes them act as a solvent in a refrigeration system. Maintaining

system cleanliness is extremely important because the oil will tend to bring any foreign

matter back to the compressor.

1. When installing the refrigerant piping, note the following:

• Brazing:

• All joints must be brazed.
• Avoid butt brazes by using couplings or swaging one of the pipes with a swaging tool.
• Ensure that all brazed joints are leak-free.
• Flow dry nitrogen through the pipes during brazing.

• Always use large-radius curves (bending radius at least equal to pipe diameter). Bend the pipes

as follows:

• soft copper: bend by hand or use bending device;
• hard copper: use preformed curves.

• To minimize oxidation, avoid overheating the pipes when brazing.

2. Connect the pipes to the condenser:

• Condensers with butt-brazed pipe connections: Cut the pipe, enlarge it and braze it to the pipe-

line.
Respect the direction of refrigerant flow. (See labels on refrigerant.)

3. Wash out the pipelines as follows:

a. Plug up the free ends of the pipes.
b. Connect a helium or nitrogen cylinder, fitted with a reducer (max. pressure 10 bar), to the

1/4" SAE Schrader valve of the condenser.

c. Pressurize the pipes with helium or nitrogen.
d. Unplug the pipes instantaneously.
e. Repeat Steps a through d several times.

This operation is especially important when hard copper piping is used.

4. Open all the shutoff valves on the room unit.
5. Discharge the room unit pressurized with helium (at 1 bar) by opening the charge valves so that

all the branches of the circuit are discharged (e.g., on the receiver, on the low pressure side and on

the compressor delivery).

6. Debraze the bottoms from the connections of the room unit.
7. Fix (braze) the pipes to the connections on the air conditioner.
8. Connect the refrigerant safety pressure relief valve to the outdoors with a 16 mm (5/8") copper

pipe. Only water/glycol units have a indoor relief valve. Air cooled units do not have an indoor

pressure relief valve.