Figure 36 termination jumper setting, 4 route the can bus wire into the cooling unit, Route the can bus wire into the cooling unit – Emerson Liebert CRV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 C R 0 2 0 R A 1 C 7 S D 1 8 1 1 E L 1 0 P A User Manual

Page 55: Unterminated terminated

Advertising
background image

Startup

47

Liebert

®

CRV

Figure 36 Termination jumper setting

9.5.4 Route the CAN bus wire into the cooling unit

The CAN bus sensors connect to the open CAN port on the back of the unit display panel. The Display

comes “Terminated” from the factory and will have to be “Un-terminated’ to allow for additional

sensors to be added. See photo above for termination jumper location for front panel display and

sensor boards. Note that connecting the CAN bus sensors will require entering the High Voltage

electrical compartment of the Liebert CRV. If you are not comfortable with the installation procedure,

it is recommended that you hire a certified electrician.

Connect the 10ft CAN wire to the open CAN bus port on the rear of the iCOM graphic display.
Ensure there is enough slack in the wire to allow the door to open and close freely, but not too much

slack to bind or pinch when the door is shut. It is recommended that a cable tie is used to secure the

wiring.
Connect the other end of the 10ft CAN cable to the nearest 2T rack sensor. Use additional CAN cables

to connect the remaining 2T rack sensors to each other. The order in which the 2T sensors are

attached does not matter; however, be sure that the last sensor connected is the one set to

“terminated”. As a best practice, avoid using excessive lengths of cable between sensors.

Unterminated

Terminated

3

2

1

3

2

1

Termination Jumper

in the Terminated Position

Circuit board inside display housing

Circuit board inside 2T sensor housing

Rear of Large Graphic Display

Source DPN001983 Rev. 0

Inside of Display Door

CAN CAN

SW/U2U

12VDC PWR

Advertising