3.4.4

Demand Power Alarm Point

[Procedure]

(1)

Write a demand power alarm point value to the two D registers in the table below. The
data type is 4-byte floating point.

(2)

After writing that value, write 1 to the demand measurement writing status register,
D0226.

D Register

D0221

D0226

Reference No.

40221

40226

H No.

00DC

00E1

Description

Demand power alarm point
(float, lower 2 bytes)

Demand measurement writing
status (D0218 to D0225 are
validated)

Effective Range

1 to 1000
Unit: kW

D0222

40222

00DD

Demand power alarm point
(float, upper 2 bytes)

If other than 1: Invalid
If 1: Writing is executed

Initial value of demand power alarm point: 100 kW

[Example]

To set the demand power alarm point to 10.0 kW:

For station number 01, use PC link communication (without checksum) and the random
write command as shown below:

If 10.0 is converted into a 4-byte floating point value, the value is 4120 0000.

[Command]

[STX]01010WRW03D0221,0000,D0222,4120,D0226,0001[ETX][CR]

[Response]

[STX]0101OK[ETX][CR]

NOTE

A demand power alarm point value can be set for the PR300 with demand measuring

function.