2 optional integration start/stop, Optional integration start/stop -36 – Yokogawa PR300 Power and Energy Meter User Manual

Page 59

Advertising
background image

3-36

<Toc> <Ind>

<3. Procedures for Setting PR300 Functions>

IM 77C01E01-10E

3.8.2

Optional Integration Start/Stop

[Procedure]

(1)

To execute optional integration start/stop, write data to the D register in the table
below. The data type is integer.

D Register

D0302

Reference No.

40302

H No.

012D

Description

Optional integration start/stop
Relevant D registers:
D0011 to D0014

Effective Range

0: Stop
1: Start

Initial value of optional integration start/stop: 0 (stop)

NOTE

Optional integration start/stop can also be controlled by digital input. Once digital input is
performed, it is the only means for such control. Control via communication is no longer
possible until the power is turned off or remote reset is executed (see subsection 3.7.1).
However, for the PR300 with demand measuring function, digital input is used to release
the demand alarm. In this case, optional integration start/stop cannot be used.

[Control via communication]

START command

STOP command

Time

Time

Perform integration for this duration

Digital input turned on

Digital input turned off

Data update

No response to
digital input requests

[Control by digital input]

Digital input turned on

Digital input turned off

Perform integration for this duration

START

command

STOP

command

Data update

No response to requests
via communication

[Example]

To execute optional integration start/stop:

For station number 01, use PC link communication (without checksum) and the random
write command as shown below:

[Command]

[STX]01010WRW01D0302,0001[ETX][CR]

[Response]

[STX]0101OK[ETX][CR]

Advertising