Welch Allyn Connex CS Central Station & Server - User Manual User Manual

Page 145

Advertising
background image

Connex CS Admin Guide

Installing Video Cards

139

Figure C-12: Video Card Insertion Pressure Point

5.

Push the I/O hold-down bracket down to its original location and install the retaining
screw.

6.

Replace the top cover, again using care so as not to damage the video card retention
foam block if present, and install the 3 top cover screws into place.

7.

Re-install the CPU at the central station location, and reconnect all cables (e.g. power,
network, video, keyboard, mouse, etc.).

8.

Power on the CPU and observe the start-up procedure. Confirm that video is
displayed on the video display.

Advertising