Welch Allyn Connex CS Central Station & Server - User Manual User Manual
Page 28
Advertising
22
Connex Server Startup
Welch Allyn
Figure 5-2: Embedded Server RAID with status display
6.
After a few seconds, the display updates to the Intel Server Board screen. An
example is shown in
“Figure 5-3: System startup display with blue Intel logo”
.
Figure 5-3: System startup display with blue Intel logo
7.
Do not press any keys unless entering maintenance modes.
8.
After a short pause, the display updates and the Windows Server 2008 operating
system begins to load. The animated Microsoft logo appears.
Advertising