Power on the system – Welch Allyn Connex CS Central Station & Server - User Manual User Manual
Page 24
Advertising
18
Central Station Startup
Welch Allyn
Power on the system
Once all peripheral items have been attached to the central station CPU, and the Connex
server installation is running (if applicable), complete these final steps to finish the install.
1.
Ensure that all components are connected to a AC power outlet.
2.
Power on the displays and any other peripherals which require power.
3.
Turn the power ON for the CPU using the power control switch on the front bezel. The
Power On Self Test (POST) runs and displays a message on the screen.
4.
On the main CPU, verify the following:
LED Indicator - front bezel
State or Condition
Power LED.
Glows a constant GREEN
when on.
Hard drive LED
Turns on after POST and CPU
attempts to boot.
Advertising