Central Station Startup

Welch Allyn

Power on the system

Once all peripheral items have been attached to the central station CPU, and the Connex
server installation is running (if applicable), complete these final steps to finish the install.

1.

Ensure that all components are connected to a AC power outlet.

2.

Power on the displays and any other peripherals which require power.

3.

Turn the power ON for the CPU using the power control switch on the front bezel. The
Power On Self Test (POST) runs and displays a message on the screen.

4.

On the main CPU, verify the following:

LED Indicator - front bezel

State or Condition

Power LED.

Glows a constant GREEN
when on.

Hard drive LED

Turns on after POST and CPU
attempts to boot.