Welch Allyn Connex CS Central Station & Server - User Manual User Manual
Page 162
156
Moving from Test to Production
Welch Allyn
a.
Using Corepoint, modify the ORU outbound connection(s) to publish observation
data to the endpoints identified in step 1 in the Preparation section. Refer to the
Connex CS Server Install Guide for additional instructions as needed.
b.
Using the Corepoint Administration screen, confirm that the connection(s) is up
and active.
Confirm Connex server operation, client-server only
These steps are only applicable for the client-server deployment. For a stand-alone
deployment, go to
“Restart after synchronization is complete”
on page 159 to continue.
1.
After the Connex server reboot is complete, login as with the Windows administrator
account.
2.
Click on
to Open the Connex CS Admin Tools launcher from the desktop.
3.
In the Admin Tools, navigate to Settings > Connections. The Services window
appears.
Figure D-8: Connex server connections and services window example
4.
Confirm that all services are in a green state. Click on Restart button to restart a
service if required.