Timing chart of parallel output, Timing chart of parallel output -38 – KEYENCE DV-90 User Manual

Page 98

Advertising
background image

4-38

E DV-90-IM

4

Ba
si

c

Func

tions

4-7 2-Point Verification Function

Timing Chart of Parallel Output

After reading the data, execute parallel output at the following timing:
The output form of OUT1 to 12 can be selected from bit, binary or BCD in the “Verification menu”.

➀...........Output ON time: Specify this in “Out ON time” in the I/O setting menu.

(

Refer to 6-11) (It can be set between 10 ms and 2550 ms. The factory setting is 500 ms.)

➁...........Output delay time: Specify this in “Out Delay” in the I/O setting menu.

(

Refer to 6-11) (It can be set between 0 ms and 255 ms. The factory setting is 5 ms.)

OUT1 to 12

• Only OUT9 to 12 turn ON while waiting for the First reading.

Only OUT5 to 8 turn ON while waiting for the Second reading.

• At Verify OK of the Second reading, OUT1 to 12 of the output numbers (1-900)

corresponding to the matched preset number turn ON.

(When the parallel output form is set to “Bit output”, OUT1 to 12 turn OFF with output

numbers over 13. The factory setting is “Bit output”.)

• When Verify NG occurs, OUT1 to 12 turn ON at output number 999.

• At Verify NG of the First reading, OUT1 to 12 turn ON at output number 998 as a Select

Master NG.

(When the parallel output form is set to “Bit output”, all turn OFF.)

• When a reading error occurs, OUT1 to 12 turn ON at output number 997.

(When the parallel output form is set to “Bit output”, all turn OFF.)

OK

Turns ON when Verify OK is output.

NG

Turns ON at Verify NG and Select Master NG.

READ_ERR

READ_ERRTurns ON when a reading error occurs.

OUT9 to 12

OUT5 to 8

OK

NG

Reading state

First data

reading

Second data

reading

First data

reading

Second data

reading

Verify OK

Verify OK

Select Master NG/Read_Error

Verify NG/Read_Error

q

q

q

q

w

w

w

w

Advertising