Upon receipt, Claims, Installation requirements – Hypertherm MicroEDGE Pro Shape Cutting Control Rev.2 User Manual

Page 51: Placement of system components

Advertising
background image

InstallatIon

MicroEDGE Pro

Instruction Manual 807290

2-3

Upon receipt

1. Verify that all the system components on your order have been received. Contact your supplier if any items are

missing.
•  MicroEDGE Pro CNC
•  AC power input cable (North America)
•  AC power input cable connector (all other regions)
•  Joystick and speedpot adapter cable for analog option
•  MicroEDGE Pro CNC instruction manual
•  Phoenix software instruction manuals (3)

2. Inspect the system components for any physical damage that may have occurred during shipping. If there is

evidence of damage, refer to Claims. All communications regarding claims must include the model number and

serial number located on the back of the CNC.

Claims

Claims for damage during shipment – If your unit was damaged during shipment, you must file a claim with the 

carrier. Hypertherm will furnish you with a copy of the bill of lading upon request. If you need additional assistance, call

Customer Service listed in the front of this manual, or your authorized Hypertherm distributor.

Claims for defective or missing merchandise – If any of the merchandise is defective or missing, contact your 

supplier. If you need additional assistance, call Hypertherm Customer Service (listed in the front of this manual) or your

authorized Hypertherm distributor.

Installation requirements

All installation and service of electrical systems must conform to national and local electrical codes. This work should be

performed only by qualified personnel.

Direct any technical questions to your authorized Hypertherm distributor or the nearest Hypertherm Technical Service

Department (listed in the front of this manual).

Placement of system components

•  Place all system components in position prior to making electrical and interface connections.
•  Ground all system components to earth. See Recommended grounding and shielding practices in this section for

details.

•  Insure that the forced air ventilation opening is not blocked.
•  Do not restrict operator access to the AC power connector for connection and disconnection of the power cord.

The AC power connector is the primary means for disconnection of power to the equipment.

Advertising