ProSoft Technology PLX8X-MNET-61850 User Manual

Page 192

Advertising
background image

PLX8x-MNET-61850 ♦ Communication Gateway

User Manual

Modbus TCP/IP to IEC 61850

Page 192 of 228

ProSoft Technology, Inc.

May 14, 2014

Gr

Group

IEC 61850-7-4

Grd

Guard

IEC 61850-7-4

Gri

Grid

IEC 61850-7-4

GS

Functional constraint - GSSE control

IEC 61850-7-2

GSAL

Logical node - General security application

IEC 61850-5

GsCB

GSSE Control Block

IEC 61850-7-2

GSSE

Generic Substation Status Event

IEC 61850-7-2

GTES

Logical node - Test generator

IEC 61850-5

H

Harmonics (phase related)

IEC 61850-7-4

H2

Hydrogen

IEC 61850-7-4

H2O

Water

IEC 61850-7-4

Ha

Harmonics (non-phase related)

IEC 61850-7-4

Hi

High or Highest

IEC 61850-7-4

HMI

Human Machine Interface

IEC 61850-3

HP

Hot Point

IEC 61850-7-4

Hz

Hertz

– frequency cycles/second

IEC 61850-7-4

i

Out-of-scope: The implementation of the item is not within the
scope of this standard

IEC 61850-9-2

I/O

Status Inputs/Output contacts, or channels

IEC 61850-5

IARC

Logical node - Archiving

IEC 61850-5

ICD

IED Configuration Description

IEC 61850-10

ID

Identifier

IEC 61850-6

IEC

International Electrotechnical Commission

IEC 61850-1

IED

Intelligent Electronic Device

IEC 61850-1

IEEE

Institute of Electrical and Electronic Engineers

IEC 61850-1

IETF

Internet Engineering Task Force

IEC 61850-8-1

IF

Interface (serial)

IEC 61850-5

IHMI

Logical node - Operator interface (control local at bay
level/control at station level)

IEC 61850-5

Imb

Imbalance

IEC 61850-7-4

Imp

Impedance (non-phase related)

IEC 61850-7-4

In

Input

IEC 61850-7-4

Ina

Inactivity

IEC 61850-7-4

INC

INteger status

– Controllable

IEC 61850-7-3

Incr

Increment

IEC 61850-7-4

Ind

Indication

IEC 61850-7-4

Inh

Inhibit

IEC 61850-7-4

Ins

Insulation

IEC 61850-7-4

Int

Integer

IEC 61850-7-4

INT128

Not Supported

Not Supported

INT16

-32 768 to 32 767

IEC 61850-7-2

Advertising