Completing the AC Connection

Completing the AC Connection

Step

Action

1

Terminate earth ground to the appropriate termination point.
Terminate lines 1, 2, 3, and neutral (if provided) to the
appropriate termination points.

2

Verify that there are no shorts or bad contacts in the service
cables.

3

Turn the main ac circuit breaker ON.

4

Use an ac voltmeter to check that the proper phase-to-phase
or phase-to-neutral ac voltage is present at the input to the ac
panel.

5

Replace the ac panel front cover. If the ac panel is equipped
with rectifier circuit breakers, mark the ac panel front cover
label with rectifier position numbers (they may already be
factory-marked). See Figure 7-2.

6

Do not turn the rectifier circuit breakers ON.

7

Turn OFF the main ac circuit breaker.