Installation Guide for Galaxy Power Systems
13 - 2 Fascia Cover Installation
Issue 12 August 2012
Installing the Fascia Covers
One front Fascia Cover and associated hardware is provided with each
GPS cabinet. Two End of Line-up Fascia Covers and associated
hardware are provided with GPS cabinet equipped with a controller.
Additional and different Fascia Panels (supplied with all necessary
hardware) must be ordered.
Refer to Figure 13-1 for an illustration of this procedure.
Refer to Figure 5-12 for fascia mounting brackets installation.
Installing the Fascia Covers
Optional on Centralized Architecture Cabinets
Step
Action
1
Install each fascia cover using the four 8-32 nuts provided.
Fascia panels are optional on the left and right ends of the
cabinet lineup.
Figure 13-1: Fascia Cover Installation